About this Project
The comprehensive 147,000 square foot renovation of the Joseph M. Gallagher PK-8 presented a unique opportunity to reimagine an existing educational facility with a deep commitment to sustainability and innovation.
Key Design Features included:
- Energy Optimization
- Optimized Insulation
- Natural Lighting
- Acoustic Efficiency
- Water Conservation
This renovation goes beyond structural upgrades—it’s a transformation setting a new benchmark for educational facilities in Cleveland and beyond. The redesigned Joseph M. Gallagher PK-8 inspires curiosity, collaboration, and growth, fostering an environment where students thrive academically, socially, and creatively.
Guided by our commitment to sustainability, the project is pursuing LEED certification, reflecting our dedication to high-performance, environmentally responsible design. Every detail, from materials to construction practices, aligns with LEED standards to deliver lasting value to the community and future generations.
Completed in March of 2025, Joseph M. Gallagher was ready to welcome students for the 2025/2026 school year. This project embodies innovative design and sustainability, redefining what’s possible for educational spaces.
From the beginning of our relationship, AVG has demonstrated an exceptional level of professionalism, creativity, and responsiveness throughout the lifetime of (our) projects. Their team took the time to thoroughly evaluate and fully understand our unique needs, our community’s values, and our joint vision for a learning environment that will serve our students for years to come.












